网络线缆

MCA4J80-N003-FLT

NVIDIA MCA4J80-N003-FLT

P/N:MCA4J80-N003-FLTSKU: 980-9I600-00N003SwitchInfra item:7875品牌: NVIDIA
规格参数
介质active copper with pre-emphasis equalizer
imageNoteManufacturer reference image. Included components follow the selected part number.
电源规格1.5 W maximum per end
Connectorstwin-port OSFP to twin-port OSFP
料号MCA4J80-N003-FLT
Branch count1
Lane mapping8 x 100G-PAM4 in each direction
Thermal profileflat to flat
Interconnect typeLACC
Branch data rate (Gb/s)800
Nominal cable length (m)3.0
Aggregate data rate (Gb/s)800
Case temperature (degrees C)0 to 70
Manufacturer lifecycle phaseMP

下单前确认

  • 确认准确的 SKU、料号、规格选项与数量。
  • 确认主机平台、端口、电气接口与固件兼容要求。
  • 付款前确认库存、交期、目的地与适用售后条款。
产品描述
Active copper cable, IB twin port NDR, up to 800Gb/s, OSFP, 3m, flat to flat

产品问答

What makes MCA4J80 active?

The manual describes a pre-emphasis equalizer in each end of a copper cable. It calls the design LACC, not an optical cable.

How are the channels arranged?

Both ends are twin-port OSFP with eight 100G-PAM4 channels for aggregate 800G, rather than a one-to-two breakout assembly.

Can these exact variants be marketed for Ethernet?

The inspected exact -FLT and -FTF rows list NDR and Ethernet NA. The supported claim here is InfiniBand NDR; Ethernet needs separate exact validation.

What are the endpoint and power requirements?

The source documents 1.5 W maximum per end. -FLT is flat-to-flat; -FTF has one flat and one finned endpoint, so confirm the host thermal geometry.

Where does forward error correction take place?

The FAQ places FEC in the switch and network adapter. Match the supported endpoint configuration; a cable does not independently fix a FEC mismatch.

Why can a cable have two minimum bend radii?

The connector exit generally needs a larger bend radius than the cable body. Follow the exact assembly drawing and leave adequate space behind the rack door.

可以先描述需求,型号、主机或数量尚未确定也能咨询。

渠道与项目资料

推进客户的下一步决策

从现有产品组合、产品系列或不完整的项目清单出发,选择与你的职责对应的资料。

OA03 · NVIDIA

AI Ethernet、网卡及光模块和线缆互连。

980-9I600-00N003

BOM 与待决项梳理

保留原始料号与数量,同时整理影响项目决策的待确认事项。

从这些信息开始
现有清单、上传的 BOM 或简要需求,不完整的清单也可以提交。
用于准备
保留原始行号、待补信息、责任人及下一动作的待决项表。