Manufacturer reference image. Included components follow the selected part number.
光模块
MMS4A50-XM-RHS
NVIDIA MMS4A50-XM-RHS
| 介质 | 单模光纤 |
|---|---|
| imageNote | Manufacturer reference image. Included components follow the selected part number. |
| 电源规格 | 28 W maximum |
| Connectors | OSFP electrical; two duplex-LC optical ports |
| 料号 | MMS4A50-XM-RHS |
| Branch count | 2 |
| Lane mapping | 8 x 200G-PAM4 electrical channels |
| Wavelength nm | CWDM grid: 1271, 1291, 1311, 1331 nm nominal |
| Thermal profile | RHS |
| Interconnect type | optical_transceiver_FRO |
| Branch data rate (Gb/s) | 800 |
| Aggregate data rate (Gb/s) | 1600 |
| Case temperature (degrees C) | 0 to 70 |
| Maximum optical or copper line reach (m) | 2000 |
下单前确认
- 确认准确的 SKU、料号、规格选项与数量。
- 确认主机平台、端口、电气接口与固件兼容要求。
- 付款前确认库存、交期、目的地与适用售后条款。
产品问答
How is the 1.6T link presented optically?
The exact ordering row specifies twin-port 2xFR4 with two duplex-LC single-mode interfaces, nominal 1310 nm-class wavelengths and reach up to 2 km.
How should IHS and RHS be chosen?
NVIDIA describes IHS for air-cooled Quantum-3 / Spectrum-6 switches and RHS for liquid-cooled variants. Confirm the actual switch configuration.
What power should be used for planning?
The current product specification lists 28 W maximum. An older deprecated parts-list snippet is not the governing source.
Is the per-port optical lane statement ready to publish?
No. The page contains conflicting channel/rate wording. This package keeps the confirmed 2xFR4 identity and electrical lane data while holding the inconsistent optical lane statement.
Is it safe to look into a connected optical port?
No. Never look directly into an energized optical port or connected fiber; its infrared light can be invisible.
Can DR4 and FR4 be directly linked?
No. DR4 uses parallel optical channels; FR4 multiplexes wavelengths onto a fiber pair. Match the optical format at both ends.
渠道与项目资料
推进客户的下一步决策
从现有产品组合、产品系列或不完整的项目清单出发,选择与你的职责对应的资料。
OA03 · NVIDIA
AI Ethernet、网卡及光模块和线缆互连。
980-9IAS1-00XM00
BOM 与待决项梳理
保留原始料号与数量,同时整理影响项目决策的待确认事项。
- 从这些信息开始
- 现有清单、上传的 BOM 或简要需求,不完整的清单也可以提交。
- 用于准备
- 保留原始行号、待补信息、责任人及下一动作的待决项表。



