光模块

MMS4B10-XM800

NVIDIA MMS4B10-XM800

P/N:MMS4B10-XM800SKU: 980-9IAK0-00XM00SwitchInfra item:7888品牌: NVIDIA
规格参数
介质单模光纤
ConnectorsOSFP electrical; MPO/APC optical
料号MMS4B10-XM800
Branch count1
Wavelength nm1310
Thermal profileRHS
Interconnect typeoptical_transceiver_TRO
Branch data rate (Gb/s)800
Aggregate data rate (Gb/s)800
Manufacturer lifecycle phaseEarly BOM
Maximum optical or copper line reach (m)500

下单前确认

  • 确认准确的 SKU、料号、规格选项与数量。
  • 确认主机平台、端口、电气接口与固件兼容要求。
  • 付款前确认库存、交期、目的地与适用售后条款。
产品描述
NVIDIA single port transceiver, DR4, 800Gbps, OSFP, MPO(APC), 1310nm SMF, up to 500m, RHS, TRO, Ethernet Only

产品问答

What connection does MMS4B10-XM800 provide?

The owner-confirmed model is an 800G single-port DR4 OSFP optic with MPO/APC, 1310 nm single-mode operation up to 500 m, RHS cooling and TRO signal processing. The exact 980 OPN is Ethernet-only.

Is InfiniBand support established?

No. Its exact release row says InfiniBand NA and Ethernet 800GE. Do not infer XDR support from other 800G optical models.

Can the 1.6T MMS4B10-XM manual supply its specifications?

No. A twin-port 1.6T family document is not exact evidence for this single-port 800G OPN. Power, lane mapping and operating temperature remain unfilled.

What launch status should be shown?

The inspected CX9 release row says Early BOM. No production-availability, stock or fulfillment promise follows from that entry.

Is it safe to look into a connected optical port?

No. Never look directly into an energized optical port or connected fiber; its infrared light can be invisible.

Can DR4 and FR4 be directly linked?

No. DR4 uses parallel optical channels; FR4 multiplexes wavelengths onto a fiber pair. Match the optical format at both ends.

What distinguishes XDR signaling from NDR?

XDR uses 200G-PAM4 signaling; NDR uses 100G-PAM4. Equal aggregate bandwidth alone does not establish interoperability.

可以先描述需求,型号、主机或数量尚未确定也能咨询。

渠道与项目资料

推进客户的下一步决策

从现有产品组合、产品系列或不完整的项目清单出发,选择与你的职责对应的资料。

OA03 · NVIDIA

AI Ethernet、网卡及光模块和线缆互连。

980-9IAK0-00XM00

BOM 与待决项梳理

保留原始料号与数量,同时整理影响项目决策的待确认事项。

从这些信息开始
现有清单、上传的 BOM 或简要需求,不完整的清单也可以提交。
用于准备
保留原始行号、待补信息、责任人及下一动作的待决项表。