OPTICAL TRANSCEIVER

IN-Q3JZ1-TC-F1

Marvell IN-Q3JZ1-TC-F1 400G QSFP-DD ZR Optical Transceiver (New)

P/N:IN-Q3JZ1-TC-F1SKU: IN-Q3JZ1-TC-F1SwitchInfra item:7228Brand: Marvell
Specifications

IN-Q3JZ1-TC-F1 technical overview

Form FactorQSFP-DD
Wavelengthtunable ITU C-band on 75 GHz grid
Connectorduplex LC over single-mode fiber
MediaSingle-mode fiber
BrandMarvell
ModelIN-Q3JZ1-TC-F1
Reachup to 120 km for 400ZR application, subject to line-system engineering
ConditionNew
Data Rate400G
Part NumberIN-Q3JZ1-TC-F1
Optical StandardOIF 400ZR
Required FEC and breakout modeintegrated concatenated FEC (C-FEC); 400GbE single-carrier 60-Gbaud 16QAM

Before you order

  • Confirm the exact SKU, part number, specification option and quantity.
  • Confirm the host platform, port, electrical interface and firmware requirements.
  • Confirm availability, lead time, destination and applicable service terms before payment.
Description
Marvell IN-Q3JZ1-TC-F1 is a supplier-listed optical module whose core specifications are supported by an official base-part or product-family source. The catalog suffix and target-host qualification remain unverified.
Features

Product specifications

Marvell IN-Q3JZ1-TC-F1 is a supplier-listed optical module whose core specifications are supported by an official base-part or product-family source. The catalog suffix and target-host qualification remain unverified.

  • Reach: up to 120 km for 400ZR application, subject to line-system engineering
  • Data Rate: 400G
  • Form Factor: QSFP-DD
  • Optical Standard: OIF 400ZR

Product questions & answers

Describe what you need. You can start without a confirmed quantity or host model.

Channel and project resources

Move your next customer decision forward

Start with your current portfolio, a product family or an incomplete project list. Choose the material that fits your responsibility.

OA03 · Marvell

IN-Q3JZ1-TC-F1

BOM and open-items review

Keep the original part numbers and quantities together with the questions that affect a project decision.

Start with
Your existing list, uploaded BOM or a short description of the requirement. Incomplete lists are welcome.
Use this to prepare
An open-items table with original line references, missing inputs, responsible people and next actions.