NETWORK ACCESSORY

C9300-NM-4G

Cisco C9300-NM-4G 4-Port Gigabit Network Module

P/N:C9300-NM-4GSKU: C9300-NM-4GSwitchInfra item:7490Brand: Cisco
Specifications
Cisco C9300-NM-4G 4-Port Gigabit Network Module. Interfaces: 4 × 1G SFP. Compatibility Scope: C9300 series; compatibility does not automatically extend to C9300X or C9300L. Product Type: Pluggable network module; not a standalone switch. Confirm included components and software entitlements when requesting a quote. Offered condition: New. Technical references Cisco technical reference 1 Cisco technical reference 2 Cisco technical reference 3
BrandCisco
ConditionNew
Interfaces4 × 1G SFP
Part NumberC9300-NM-4G
Product TypePluggable network module; not a standalone switch
Product SeriesCatalyst 9300
Compatibility ScopeC9300 series; compatibility does not automatically extend to C9300X or C9300L
Transceivers and CablesNot assumed to be included

Before you order

  • Confirm the exact SKU, part number, specification option and quantity.
  • Confirm the host platform, port, electrical interface and firmware requirements.
  • Confirm availability, lead time, destination and applicable service terms before payment.
Description
Cisco C9300-NM-4G 4-Port Gigabit Network Module. Interfaces: 4 × 1G SFP. Compatibility Scope: C9300 series; compatibility does not automatically extend to C9300X or C9300L. Product Type: Pluggable network module; not a standalone switch. Confirm included components and software entitlements when requesting a quote. Offered condition: New.

Product questions & answers

Describe what you need. You can start without a confirmed quantity or host model.

Channel and project resources

Move your next customer decision forward

Start with your current portfolio, a product family or an incomplete project list. Choose the material that fits your responsibility.

OA03 · Cisco

Campus networking, replacement requirements and project parts.

C9300-NM-4G

BOM and open-items review

Keep the original part numbers and quantities together with the questions that affect a project decision.

Start with
Your existing list, uploaded BOM or a short description of the requirement. Incomplete lists are welcome.
Use this to prepare
An open-items table with original line references, missing inputs, responsible people and next actions.