Cisco model reference image; included accessories are confirmed with the quotation.
POWER SUPPLY
C9K-PWR-650WAC-R
Cisco C9K-PWR-650WAC-R 650W AC Power Supply
Specifications
Cisco C9K-PWR-650WAC-R 650W AC Power Supply. Rated Power: 650 W (rated output, not measured system consumption). Input Type: AC input; confirm the voltage range on the label and datasheet. Compatibility Scope: Supported C9500-32QC/24Y4C/48Y4C models; check the host matrix. Confirm included components and software entitlements when requesting a quote. Offered condition: New. Technical references Cisco technical reference 1
| Brand | Cisco |
|---|---|
| Condition | New |
| Input Type | AC input; confirm the voltage range on the label and datasheet |
| Part Number | C9K-PWR-650WAC-R |
| Rated Power | 650 W (rated output, not measured system consumption) |
| Product Type | Power supply module; not a complete system |
| Product Series | Catalyst 9500 |
| Compatibility Scope | Supported C9500-32QC/24Y4C/48Y4C models; check the host matrix |
Before you order
- Confirm the exact SKU, part number, specification option and quantity.
- Confirm the host platform, port, electrical interface and firmware requirements.
- Confirm availability, lead time, destination and applicable service terms before payment.
Description
Cisco C9K-PWR-650WAC-R 650W AC Power Supply. Rated Power: 650 W (rated output, not measured system consumption). Input Type: AC input; confirm the voltage range on the label and datasheet. Compatibility Scope: Supported C9500-32QC/24Y4C/48Y4C models; check the host matrix. Confirm included components and software entitlements when requesting a quote. Offered condition: New.
Product questions & answers
Channel and project resources
Move your next customer decision forward
Start with your current portfolio, a product family or an incomplete project list. Choose the material that fits your responsibility.
OA03 · Cisco
Campus networking, replacement requirements and project parts.
C9K-PWR-650WAC-R
BOM and open-items review
Keep the original part numbers and quantities together with the questions that affect a project decision.
- Start with
- Your existing list, uploaded BOM or a short description of the requirement. Incomplete lists are welcome.
- Use this to prepare
- An open-items table with original line references, missing inputs, responsible people and next actions.


