NETWORK SWITCH

C9200L-24T-4G-E

Cisco C9200L-24T-4G-E 24-Port Gigabit Fixed-Uplink Switch

P/N:C9200L-24T-4G-ESKU: C9200L-24T-4G-ESwitchInfra item:7519Brand: Cisco
Specifications
Cisco C9200L-24T-4G-E 24-Port Gigabit Fixed-Uplink Switch. Downlinks: 24 × 10/100/1000BASE-T. Uplinks: 4 × 1G SFP, fixed uplinks. Port Power: No PoE. Confirm included components and software entitlements when requesting a quote. Offered condition: New. Technical references Cisco technical reference 1 Cisco technical reference 2
BrandCisco
Uplinks4 × 1G SFP, fixed uplinks
StackingStackWise-80; requires C9200L-STACK-KIT
ConditionNew
Downlinks24 × 10/100/1000BASE-T
Port PowerNo PoE
Part NumberC9200L-24T-4G-E
Software SKUNetwork Essentials; confirm license entitlement
Product SeriesCatalyst 9200L

Before you order

  • Confirm the exact SKU, part number, specification option and quantity.
  • Confirm the host platform, port, electrical interface and firmware requirements.
  • Confirm availability, lead time, destination and applicable service terms before payment.
Description
Cisco C9200L-24T-4G-E 24-Port Gigabit Fixed-Uplink Switch. Downlinks: 24 × 10/100/1000BASE-T. Uplinks: 4 × 1G SFP, fixed uplinks. Port Power: No PoE. Confirm included components and software entitlements when requesting a quote. Offered condition: New.

Product questions & answers

Can the C9200L-24T-4G-E uplinks be upgraded to 10G?

No. Its four 1G SFP uplinks are fixed. For 10G uplinks, choose a different switch configuration such as C9200L-24T-4X-E, which has four fixed 1/10G uplinks; replacing an SFP or adding a network module does not turn the 4G model into the 4X model.

Describe what you need. You can start without a confirmed quantity or host model.

Channel and project resources

Move your next customer decision forward

Start with your current portfolio, a product family or an incomplete project list. Choose the material that fits your responsibility.

OA03 · Cisco

Campus networking, replacement requirements and project parts.

C9200L-24T-4G-E

BOM and open-items review

Keep the original part numbers and quantities together with the questions that affect a project decision.

Start with
Your existing list, uploaded BOM or a short description of the requirement. Incomplete lists are welcome.
Use this to prepare
An open-items table with original line references, missing inputs, responsible people and next actions.