Product reference photograph. Cable length is defined by this listing; bends and routing in the photograph do not indicate length.
1 / 3
NETWORK CABLE
40G to 4 × 10G AOC Cable, QSFP+ to 4 × SFP+, 10 m (CABLE-NC19)
Request a quote
Tell us what you need. We confirm the available option and terms in writing.
Ask for price
Supplier-reported availability
Your preference; availability is confirmed in the quote.
- Delivery is confirmed with your order or quotation.
- Confirm seller warranty terms before ordering.
- Confirm return terms before ordering.
Specifications
Cable selection and application
For a 10 m optical breakout from a QSFP+ parent to four SFP+ interfaces. Check that each branch reaches its endpoint instead of relying only on the overall length.
| Form Factor | QSFP+ |
|---|---|
| Media | Optical fiber |
| Cable Length | 10 m |
| Data Rate | 40 Gb/s |
| Operating Temperature | Case temperature: 0–70 °C |
| Model | CABLE-NC19 |
| Condition | New |
| Cable Type | AOC |
| Power Supply | 3.135–3.465 V; typical3.3 V |
| Product Type | Active optical cable (AOC) |
| End Connectors | QSFP+ → 4×SFP+ |
| Operating Humidity | 5–85%, non-condensing |
| Storage Temperature | −40–85 °C |
Before you order
- Confirm the exact SKU, part number, specification option and quantity.
- Confirm the host platform, port, electrical interface and firmware requirements.
- Confirm availability, lead time, destination and applicable service terms before payment.
Description
40 Gb/s; QSFP+ → 4×SFP+; 10 m. For a 10 m optical breakout from a QSFP+ parent to four SFP+ interfaces.
Product questions & answers
Channel and project resources
Move your next customer decision forward
Start with your current portfolio, a product family or an incomplete project list. Choose the material that fits your responsibility.
OA03 · Multi-brand
CABLE-NC19
BOM and open-items review
Keep the original part numbers and quantities together with the questions that affect a project decision.
- Start with
- Your existing list, uploaded BOM or a short description of the requirement. Incomplete lists are welcome.
- Use this to prepare
- An open-items table with original line references, missing inputs, responsible people and next actions.



