NETWORK ADAPTER

900-9D3B6-00CV-AA0

NVIDIA BlueField-3 B3220 DPU (900-9D3B6-00CV-AA0)

P/N:900-9D3B6-00CV-AA0NVIDIA OPN: 900-9D3B6-00CV-AA0SwitchInfra item:7741Brand: NVIDIA
Specifications
Part Number900-9D3B6-00CV-AA0
Host interfacePCIe 5.0 x16
Port count2
ConnectorQSFP112
Maximum Ethernet rate (Gb/s)200
Infiniband maximum modeNDR200
Form factorFHHL
imageNoteManufacturer reference image. Included components follow the selected part number.
EccYes
ModelB3220
SeriesP-Series
BracketTall
Arm cores16
Product typeDPU
Integrated bmcYes
Reference PSIDMT_0000000884
Slot occupancysingle-slot
Onboard storage40 GB pSLC eMMC and 128 GB SSD
Onboard DDR5 (GB)32
Onboard memory gb32
Card dimensions (mm)111.15 x 167.65
Hardware crypto enabledYes
Default network protocolEthernet
DDR5 transfer rate (MT/s)5200; 5600 MT/s is documented from hardware revision AC; confirm the actual revision.
Operating humidity (% RH)10 to 85
Nonoperating humidity (% RH)10 to 90
Manufacturer lifecycle statusMass Production
Installation power requirementSupplementary 8-pin PCIe ATX power cable is required and is not included.
Maximum operating altitude (m)3050
Storage temperature (degrees C)-40 to 70
Operating temperature (degrees C)0 to 55
PCIe x16 extension hardware optionYes

Before you order

  • Confirm the exact SKU, part number, specification option and quantity.
  • Confirm the host platform, port, electrical interface and firmware requirements.
  • Confirm availability, lead time, destination and applicable service terms before payment.
Description
The BlueField-3 B3220 is a single-slot FHHL DPU with two QSFP112 network ports, 16 Arm cores and 32 GB of on-board DDR5. This exact configuration supports 200GbE and NDR200 InfiniBand over a PCIe 5.0 x16 host connection. Hardware crypto is enabled; an integrated BMC supports platform management. Match the full order code, server power path and cooling arrangement before deployment.

Product questions & answers

Which network protocol does this variant use by default?

It defaults to Ethernet. Its documented upper rates are 200GbE and NDR200 InfiniBand. Changing link type requires the supported configuration procedure and matching network equipment.

What power and cooling checks are needed before installation?

Supplementary 8-pin PCIe ATX power cable is required and is not included. Verify the server-specific airflow and power specifications before installation.

Can an auxiliary kit automatically enable Socket Direct?

This model has an x16 PCIe extension hardware option. However, the current BlueField-3 introduction explicitly says Socket-Direct is not supported by firmware. Confirm firmware and deployment-mode support before ordering; a kit alone is not proof of working Socket Direct.

Is B3220 a DPU or a SuperNIC, and why does the suffix matter?

This order code is a DPU: P-Series, 16 Arm cores and 32 GB DDR5. Keep the entire order code when matching a server configuration; another BlueField-3 variant can differ in memory, crypto, networking speed and cooling.

Is hardware crypto enabled on this exact variant?

Crypto is enabled on 900-9D3B6-00CV-AA0. A shared family name or physically similar board does not establish crypto capability.

Which image and firmware evidence should be used to identify delivered units?

The official illustration represents the listed B3220 configuration group, not your delivered batch. Obtain the actual label, hardware revision and PSID, then match firmware to the exact device. The reference PSID is MT_0000000884.

Describe what you need. You can start without a confirmed quantity or host model.

Channel and project resources

Move your next customer decision forward

Start with your current portfolio, a product family or an incomplete project list. Choose the material that fits your responsibility.

OA03 · NVIDIA

AI Ethernet, adapters and optical or cable interconnects.

900-9D3B6-00CV-AA0

BOM and open-items review

Keep the original part numbers and quantities together with the questions that affect a project decision.

Start with
Your existing list, uploaded BOM or a short description of the requirement. Incomplete lists are welcome.
Use this to prepare
An open-items table with original line references, missing inputs, responsible people and next actions.