Manufacturer reference image. Included components follow the selected part number.
NETWORK SWITCH
MTEF-KIT-F
NVIDIA MTEF-KIT-F rack installation kit
| imageNote | Manufacturer reference image. Included components follow the selected part number. |
|---|---|
| Part Number | MTEF-KIT-F |
| Owner-listed systems | SN3700; SN3700C; SN3800; SN4600; SN4600C |
| Publicly listed systems | SN3700; SN3700C |
| Rack-depth class in source | Short or standard depth; SN3700/SN3700C table scope |
Before you order
- Confirm the exact SKU, part number, specification option and quantity.
- Confirm the host platform, port, electrical interface and firmware requirements.
- Confirm availability, lead time, destination and applicable service terms before payment.
Product questions & answers
Can I select a replacement by appearance or wattage alone?
Use the manufacturer replacement-parts table for the complete switch model and order code. Matching dimensions, connector shape or PSU wattage alone does not establish compatibility.
Where should I check the replacement procedure?
Use the hardware manual for the exact chassis and component. Treat the replacement-parts list as ordering guidance; it does not replace the installation, airflow and safety instructions.
What should I confirm before choosing a rack kit?
Confirm the switch model, rack type and post spacing. The manuals distinguish fixed and tool-less mounting and list model-specific kits; a nominal rack width does not establish fit.
Does a public ordering or compatibility entry prove stock and delivery?
No. Record the manufacturer’s published lifecycle wording separately from commercial availability. Stock, lead time, software entitlement, support and warranty require a current supplier quote.
Channel and project resources
Move your next customer decision forward
Start with your current portfolio, a product family or an incomplete project list. Choose the material that fits your responsibility.
OA03 · NVIDIA
AI Ethernet, adapters and optical or cable interconnects.
930-9BRKT-00JJ-000
BOM and open-items review
Keep the original part numbers and quantities together with the questions that affect a project decision.
- Start with
- Your existing list, uploaded BOM or a short description of the requirement. Incomplete lists are welcome.
- Use this to prepare
- An open-items table with original line references, missing inputs, responsible people and next actions.


