NETWORK ADAPTER

NVIDIA BlueField-2 Dual-Port 100GbE DPU — MBF2H516C-CES0T (900-9D208-0076-ST1)

P/N:900-9D208-0076-ST1NVIDIA OPN: 900-9D208-0076-ST1SwitchInfra item:7935Brand:NVIDIA

Request a quote

Tell us what you need. We confirm the available option and terms in writing.

Ask for price
Supplier-reported availability

Your preference; availability is confirmed in the quote.

  • Delivery is confirmed with your order or quotation.
  • Confirm seller warranty terms before ordering.
  • Confirm return terms before ordering.

Specifications

MBF2H516C-CES0T specifications

Part Number900-9D208-0076-ST1
Host interfacePCIe 4.0 x16
ModelMBF2H516C-CES0T
Ports2 × 100GbE QSFP56
Memory16 GB
SecuritySecure boot, crypto disabled
ManagementIntegrated BMC and 1GbE out-of-band management
Board formatFull-height, half-length
Reference PSIDMT_0000000738
NVIDIA part number900-9D208-0076-ST1

Before you order

  • Confirm the exact SKU, part number, specification option and quantity.
  • Confirm the host platform, port, electrical interface and firmware requirements.
  • Confirm availability, lead time, destination and applicable service terms before payment.

Description

The BlueField-2 P-Series MBF2H516C-CES0T is a full-height, half-length Ethernet DPU with two 100GbE QSFP56 ports and a PCIe 4.0 x16 host interface. This configuration has 16 GB of onboard memory, an integrated BMC and a 1GbE out-of-band management interface.

Example BOM and related parts

BlueField-2 P-Series 100GbE link maintenance BOM

Service one 100GbE data link between a BlueField-2 P-Series DPU and an installed compatible Ethernet port. The example uses one of the DPU’s two data ports.

RoleModel and order codeExample quantity or statusSelection notes
BlueField-2 P-Series DPUMBF2H516C-CESOT This product900-9D208-0076-ST11Match 900-9D208-0076-ST1 and PSID MT_0000000738 on the unit. NVIDIA spells the OPN CESOT with the letter O.
15 m 100GbE QSFP28 AOCMFA1A00-C015980-9I13A-00C0151Use this validated Ethernet AOC for a like-for-like repair after checking support at the installed switch.
Installed switch port100GbE EthernetVerify switch compatibilityCheck the exact switch port, link mode, cable support and FEC. Confirm the existing port and cable route before ordering.
Host slot and auxiliary powerPCIe x16 and 6-pin ATXVerify server fit and harnessCheck FHHL clearance and the approved server-side power harness against the DPU installation manual.
Out-of-band management1GbE management portPlan separate managementIdentify the management port and cable if the site uses the integrated BMC. Count it separately from the 100GbE data cable.

Match the DPU order code and PSID, host power and cooling, switch port and firmware. The illustrated AOC is an end-of-life part for an installed link; qualify a current cable separately for new deployments.

View the full BOM and options Request a BOM review

Product questions & answers

How do I reconcile CES0T and CESOT on a supplier listing?

NVIDIA documents both spellings against ordering code 900-9D208-0076-ST1. Match the code on the board label and use reference PSID MT_0000000738 as a further check.

Which security options does this configuration provide?

NVIDIA lists secure boot enabled and hardware crypto disabled for this exact ordering code. Include both settings in the RFQ if the project requires a specific security configuration.

Which ports should I reserve for data and management?

Plan two QSFP56 connections for 100GbE data. The DPU also has a separate 1GbE out-of-band management interface and an integrated BMC.

Describe what you need. You can start without a confirmed quantity or host model.

Channel and project resources

Move your next customer decision forward

Start with your current portfolio, a product family or an incomplete project list. Choose the material that fits your responsibility.

OA03 · NVIDIA

AI Ethernet, adapters and optical or cable interconnects.

900-9D208-0076-ST1

BOM and open-items review

Keep the original part numbers and quantities together with the questions that affect a project decision.

Start with
Your existing list, uploaded BOM or a short description of the requirement. Incomplete lists are welcome.
Use this to prepare
An open-items table with original line references, missing inputs, responsible people and next actions.