OPTICAL TRANSCEIVER

SwitchInfra 800 Gb/s OSFP SR8 100 m Transceiver (800G100M-SR8-OSFP)

P/N:800G100M-SR8-OSFPSKU: 800G100M-SR8-OSFPSwitchInfra item:8010Brand:SwitchInfra

Request a quote

Tell us what you need. We confirm the available option and terms in writing.

Ask for price
Availability on request
Compatibility and custom coding

Equipment-specific coding is available to order. Include the device model, port and firmware for confirmation with your quote.

Target equipment brand

Your preference; availability is confirmed in the quote.

  • Delivery is confirmed with your order or quotation.
  • Confirm seller warranty terms before ordering.
  • Confirm return terms before ordering.

Specifications

Form FactorOSFP
Wavelength850 nm
Connector2 × MPO-12
Data Rate800 Gb/s
Part Number800G100M-SR8-OSFP
ManufacturerSwitchInfra
Maximum Power≤15 W
Optical EngineEML + PIN
Fiber / Cable TypeMultimode fiber
Optical / Electrical TypeSR8
Max. Transmission Distance100 m on MMF

Dual MPO-12 configuration confirmation before quoting

FieldStatusWhat to verify
Host compatibilityPending verificationMatch the dual MPO-12 SR8 order code, EML/PIN build, host cage, 800G port mode, firmware and FEC. Match any MQM9790 test claim to the tested ordering variant.
Ordering configurationPending verificationConfirm APC or UPC polish, pinning and polarity for the two MPO-12 connectors. Confirm thermal housing and the exact 100 m order code.

Dual MPO-12 configuration reference specifications

Reference limits apply to the cited supplier models. Confirm the values for the offered unit.

SpecificationReference value
Supply Voltage3.3 V
Lane Information8 × 106.25 Gb/s PAM4
DOM / DDMDDM

Example BOM • Dual MPO-12 configuration

Two matching endpoints · conditional example

RolePart number or selectionExample quantitySelection notes
Optics at both ends800G100M-SR8-OSFP2 modulesUse matching dual MPO-12 modules at each endpoint.
Patch assemblyMPO-12 multimode parallel assemblies2 optical pathsMatch polish, pinning and polarity at both ends and confirm the link budget.

Before you order

  • Confirm the exact SKU, part number, specification option and quantity.
  • Confirm the host platform, port, electrical interface and firmware requirements.
  • Confirm availability, lead time, destination and applicable service terms before payment.

Description

800 Gb/s OSFP SR8 for 100 m on multimode fiber with two MPO-12 interfaces, EML plus PIN and a 15 W maximum.

FiberMall's MQM9790 report names its separate OSFP-800G-SR8D test sample. Confirm recognition and mode for the specified dual-port EML/PIN build.

Use a OSFP port that supports the required rate and port mode. Match the FEC and encoding to the selected optic and platform.

Two MPO-12 optical ports are specified. Confirm polish and housing when ordering.

  • Host compatibility · Pending verification. Match the dual MPO-12 SR8 order code, EML/PIN build, host cage, 800G port mode, firmware and FEC. Match any MQM9790 test claim to the tested ordering variant.
  • Ordering configuration · Pending verification. Confirm APC or UPC polish, pinning and polarity for the two MPO-12 connectors. Confirm thermal housing and the exact 100 m order code.

Request a quote for the selected build. The written quotation confirms order code, availability, lead time, price and applicable terms.

Product questions & answers

Which connector and housing should I order?

Order the dual MPO-12 housing with matching multimode assemblies. Confirm APC or UPC, pinning and polarity.

Does every version reach 100 m?

The catalog gives 100 m for the sample configuration. Confirm the exact module, fiber grade and link budget for the quoted variant.

Describe what you need. You can start without a confirmed quantity or host model.

Channel and project resources

Move your next customer decision forward

Start with your current portfolio, a product family or an incomplete project list. Choose the material that fits your responsibility.

OA03 · SwitchInfra

800G100M-SR8-OSFP

BOM and open-items review

Keep the original part numbers and quantities together with the questions that affect a project decision.

Start with
Your existing list, uploaded BOM or a short description of the requirement. Incomplete lists are welcome.
Use this to prepare
An open-items table with original line references, missing inputs, responsible people and next actions.