Catalyst 9300 BOM: C9300L Uplinks, UB/UXB, HXN and RF Variants
Compare exact Catalyst 9300 ordering strings: 2Q versus 4X uplinks, UB/UXB and HXN hosts, A/E licenses and C9300X-NM-2C-RF provenance for a complete RFQ.
Read the whole ordering string
Use the full identifier on the BOM. The table separates chassis, a network module, spare-order variants and an unresolved software identifier. It is a comparison checklist, not a stock list. The A and E designations correspond to Network Advantage and Network Essentials; the delivered unit’s license ownership, subscriptions and support rights still require verification.
| Exact ordering string | Selection checkpoint | Inquiry |
|---|---|---|
C9300X-NM-2C-RF |
Refresh network module; 2 × 40/100G, host support required | Request a quote |
C9300L-24UXG-2Q-E |
24 access ports, 8 mGig; 2 × 40G uplinks; E | Request a quote |
C9300-24UB-E |
24 × 1G, higher-scale UPOE; modular uplink; E | Request a quote |
C9300-48UB-E |
48 × 1G, higher-scale UPOE; modular uplink; E | Request a quote |
C9300X-48HXN-A |
48-port UPOE+; check 40 × 5G + 8 × 10G mix; A | Request a quote |
C9300X-48HXN-E |
Same HXN hardware family; E license designation | Request a quote |
C9300L-48UXG-2Q-A |
48 access ports, 12 mGig; 2 × 40G uplinks; A | Request a quote |
C9300L-24UXG-4X-A |
24 access ports, 8 mGig; 4 × 10G uplinks; A | Request a quote |
C9300L-48UXG-4X-E |
48 access ports, 12 mGig; 4 × 10G uplinks; E | Request a quote |
C9300-24UB-E= |
Preserve the spare-order string; confirm offer scope | Request a quote |
C9300-48UB-E= |
Preserve the spare-order string; confirm offer scope | Request a quote |
C9300-24UXB-A |
24 mGig ports, higher-scale UPOE; modular uplink; A | Request a quote |
SC9300UK9-177 |
Software-looking identifier: exact Cisco ordering evidence still required | Confirm exact identifier |
C9300L-24UXG-4X-E |
24 access ports, 8 mGig; 4 × 10G uplinks; E | Request a quote |
C9300L-48UXG-2Q-E |
48 access ports, 12 mGig; 2 × 40G uplinks; E | Request a quote |
2Q and 4X change the uplink plan
Select the C9300L fixed uplink layout from the required peer ports. A C9300X network module is not an upgrade path for a fixed-uplink C9300L. Check the exact chassis in the installation guide before adding modules, optics or stack parts. Do not substitute a nearby model without recording which ports, power or software requirements change.
UB, UXB and HXN need different checks
For a high-scale UB/UXB replacement, verify stack membership and supported combinations rather than assuming all C9300 models can join it. For HXN, count the endpoints needing each rate and the required PoE mode before calculating the power budget. Include the power supply configuration and behavior after a supply failure in the acceptance plan.
Is the related NM-2C product the RF variant?
The related C9300X-NM-2C product is a different catalog identity from C9300X-NM-2C-RF. Cisco’s Refresh page establishes the RF model, but does not establish our batch, stock, certification or warranty. Keep RF explicitly on the inquiry if required, and ask for provenance and readable labels. Do not silently remove RF when comparing quotes.
What belongs on a complete RFQ?
List chassis, power supplies and regional cords, uplinks, peer optics and fiber, stack hardware, software entitlements, requested condition, quantities and delivery destination. Keep SC9300UK9-177 pending until an exact ordering record and entitlement scope are provided; do not quote it as a switch or assume zero price from a spreadsheet cell. Ask the supplier to flag substitutions and exclusions before approval.
Related catalog reference
C9300X-NM-2C (not the RF catalog identity). Confirm the offered condition and host support.
Continue selection
-
Cisco GLC-BX, 100FX and 100LX: Match Rate, Fiber and the Far End
-
Cisco CWDM-SFP 1470–1610: Specify the Wavelength and Channel Plan
Manufacturer references
Reviewed 6 November 2026. Recheck host support and lifecycle status for the intended deployment. These guides do not assert stock or guaranteed compatibility.
Practical project worksheets
Download only what helps your task. You can send your existing list now and add missing details later. Worksheets are in English.
BOM and milestone handoff
Original line items, missing decisions, customer target date, supplier confirmation and next update.
Download the worksheetDiscuss the existing requirements →