NETWORK CABLE

SFP-H10GB-CU5M-RF

Cisco SFP-H10GB-CU5M-RF 10G 5m Passive DAC Cable

Cisco uses -RF for Refresh remanufactured products. The seller-described offered condition is “New”; this does not establish factory-new origin, Cisco Refresh provenance, warranty or service entitlement. Confirm the unit label, packaging and sourcing documents before ordering. Cisco Refresh FAQ

P/N:SFP-H10GB-CU5M-RFSKU: SFP-H10GB-CU5M-RFSwitchInfra item:7526Brand: Cisco
Specifications
Cisco SFP-H10GB-CU5M-RF 10G 5m Passive DAC Cable. Data Rate: 10 Gbps. End Connectors: SFP+ ↔ SFP+. Cable Length: 5 m. Confirm included components and software entitlements when requesting a quote. Offered condition: New. Technical references Cisco technical reference 1 Cisco technical reference 2
Form FactorSFP+
MediaPassive direct-attach copper cable (DAC)
Cable Length5 m
Data Rate10 Gbps
BrandCisco
ConditionNew
Cable TypeOne-to-one direct connection; not a breakout cable
Part NumberSFP-H10GB-CU5M-RF
End ConnectorsSFP+ ↔ SFP+
Product SeriesCisco 10G DAC

Before you order

  • Confirm the exact SKU, part number, specification option and quantity.
  • Confirm the host platform, port, electrical interface and firmware requirements.
  • Confirm availability, lead time, destination and applicable service terms before payment.
Description
Cisco SFP-H10GB-CU5M-RF 10G 5m Passive DAC Cable. Data Rate: 10 Gbps. End Connectors: SFP+ ↔ SFP+. Cable Length: 5 m. Confirm included components and software entitlements when requesting a quote. Offered condition: New.

Product questions & answers

Describe what you need. You can start without a confirmed quantity or host model.

Channel and project resources

Move your next customer decision forward

Start with your current portfolio, a product family or an incomplete project list. Choose the material that fits your responsibility.

OA03 · Cisco

Campus networking, replacement requirements and project parts.

SFP-H10GB-CU5M-RF

BOM and open-items review

Keep the original part numbers and quantities together with the questions that affect a project decision.

Start with
Your existing list, uploaded BOM or a short description of the requirement. Incomplete lists are welcome.
Use this to prepare
An open-items table with original line references, missing inputs, responsible people and next actions.