NETWORK CABLE

STACK-T2-1M-RF

Cisco STACK-T2-1M-RF 1m Type 2 Stacking Cable

Cisco uses -RF for Refresh remanufactured products. The seller-described offered condition is “New”; this does not establish factory-new origin, Cisco Refresh provenance, warranty or service entitlement. Confirm the unit label, packaging and sourcing documents before ordering. Cisco Refresh FAQ

P/N:STACK-T2-1M-RFSKU: STACK-T2-1M-RFSwitchInfra item:7528Brand: Cisco
Specifications
Cisco STACK-T2-1M-RF 1m Type 2 Stacking Cable. Cable Length: 1 m. Application: StackWise data stacking. Compatibility Scope: Matching Catalyst 3650 stacking adapters. Confirm included components and software entitlements when requesting a quote. Offered condition: New. Technical references Cisco technical reference 1 Cisco technical reference 2
Cable Length1 m
BrandCisco
ConditionNew
ApplicationStackWise data stacking
Part NumberSTACK-T2-1M-RF
Product SeriesCatalyst 3650
Purchasing ChecksCheck cable contacts, locking and connection stability
Compatibility ScopeMatching Catalyst 3650 stacking adapters

Before you order

  • Confirm the exact SKU, part number, specification option and quantity.
  • Confirm the host platform, port, electrical interface and firmware requirements.
  • Confirm availability, lead time, destination and applicable service terms before payment.
Description
Cisco STACK-T2-1M-RF 1m Type 2 Stacking Cable. Cable Length: 1 m. Application: StackWise data stacking. Compatibility Scope: Matching Catalyst 3650 stacking adapters. Confirm included components and software entitlements when requesting a quote. Offered condition: New.

Product questions & answers

Describe what you need. You can start without a confirmed quantity or host model.

Channel and project resources

Move your next customer decision forward

Start with your current portfolio, a product family or an incomplete project list. Choose the material that fits your responsibility.

OA03 · Cisco

Campus networking, replacement requirements and project parts.

STACK-T2-1M-RF

BOM and open-items review

Keep the original part numbers and quantities together with the questions that affect a project decision.

Start with
Your existing list, uploaded BOM or a short description of the requirement. Incomplete lists are welcome.
Use this to prepare
An open-items table with original line references, missing inputs, responsible people and next actions.