NETWORK SWITCH

N3K-C3172TQ-XL-RF

Cisco N3K-C3172TQ-XL-RF 48-Port 10GBASE-T Switch with Six 40G Ports

Cisco uses -RF for Refresh remanufactured products. The seller-described offered condition is “New”; this does not establish factory-new origin, Cisco Refresh provenance, warranty or service entitlement. Confirm the unit label, packaging and sourcing documents before ordering. Cisco Refresh FAQ

P/N:N3K-C3172TQ-XL-RFSKU: N3K-C3172TQ-XL-RFSwitchInfra item:7537Brand: Cisco
Specifications
Cisco N3K-C3172TQ-XL-RF 48-Port 10GBASE-T Switch with Six 40G Ports. Downlinks: 48 × 10GBASE-T RJ45. Uplinks: 6 × 40G QSFP+. Rack Height: 1RU. Confirm included components and software entitlements when requesting a quote. Offered condition: New. Technical references Cisco technical reference 1 Cisco technical reference 2
BrandCisco
Uplinks6 × 40G QSFP+
ConditionNew
Downlinks48 × 10GBASE-T RJ45
Part NumberN3K-C3172TQ-XL-RF
Rack Height1RU
Product SeriesNexus 3100
Variant DistinctionTQ uses copper ports; PQ optical-port images and specifications do not apply

Before you order

  • Confirm the exact SKU, part number, specification option and quantity.
  • Confirm the host platform, port, electrical interface and firmware requirements.
  • Confirm availability, lead time, destination and applicable service terms before payment.
Description
Cisco N3K-C3172TQ-XL-RF 48-Port 10GBASE-T Switch with Six 40G Ports. Downlinks: 48 × 10GBASE-T RJ45. Uplinks: 6 × 40G QSFP+. Rack Height: 1RU. Confirm included components and software entitlements when requesting a quote. Offered condition: New.

Product questions & answers

Describe what you need. You can start without a confirmed quantity or host model.

Channel and project resources

Move your next customer decision forward

Start with your current portfolio, a product family or an incomplete project list. Choose the material that fits your responsibility.

OA03 · Cisco

Campus networking, replacement requirements and project parts.

N3K-C3172TQ-XL-RF

BOM and open-items review

Keep the original part numbers and quantities together with the questions that affect a project decision.

Start with
Your existing list, uploaded BOM or a short description of the requirement. Incomplete lists are welcome.
Use this to prepare
An open-items table with original line references, missing inputs, responsible people and next actions.