NETWORK SWITCH
920-9B36F-00NX-GS0
NVIDIA Q3300-LD Quantum-3 XDR InfiniBand switch
| Form factor | 3U |
|---|---|
| Model | Q3300-LD |
| Cooling | 100% liquid-cooled |
| Rail kit | Included |
| Data cages | 72 × OSFP |
| Data ports | 144 × XDR |
| Part Number | 920-9B36F-00NX-GS0 |
| Power input | 48 VDC |
Before you order
- Confirm the exact SKU, part number, specification option and quantity.
- Confirm the host platform, port, electrical interface and firmware requirements.
- Confirm availability, lead time, destination and applicable service terms before payment.
Product questions & answers
Can I select a replacement by appearance or wattage alone?
Use the manufacturer replacement-parts table for the complete switch model and order code. Matching dimensions, connector shape or PSU wattage alone does not establish compatibility.
Does a public ordering or compatibility entry prove stock and delivery?
No. Record the manufacturer’s published lifecycle wording separately from commercial availability. Stock, lead time, software entitlement, support and warranty require a current supplier quote.
Which configuration details should I confirm before ordering?
Keep the complete order code and legacy identifier together. Confirm the listed power, airflow or cooling arrangement, mounting requirements and included parts for the configuration being ordered.
What is the specified configuration of 920-9B36F-00NX-GS0?
NVIDIA Quantum-3 based XDR InfiniBand Switch, Q3300-LD, 3U,144 XDR Ports over 72 OSFP Cages, 48 VDC, Standard Depth, Managed, 100% Liquid-cooled, Rail Kit.
Channel and project resources
Move your next customer decision forward
Start with your current portfolio, a product family or an incomplete project list. Choose the material that fits your responsibility.
OA03 · NVIDIA
AI Ethernet, adapters and optical or cable interconnects.
920-9B36F-00NX-GS0
BOM and open-items review
Keep the original part numbers and quantities together with the questions that affect a project decision.
- Start with
- Your existing list, uploaded BOM or a short description of the requirement. Incomplete lists are welcome.
- Use this to prepare
- An open-items table with original line references, missing inputs, responsible people and next actions.


