NETWORK SWITCH

MTDF-DST-A

NVIDIA MTDF-DST-A port dust cap

P/N:MTDF-DST-ASKU: 930-9BBLK-00HW-000SwitchInfra item:7777Brand: NVIDIA
Specifications
imageNoteManufacturer reference image. Included components follow the selected part number.
Part NumberMTDF-DST-A
Pack quantity32 units

Before you order

  • Confirm the exact SKU, part number, specification option and quantity.
  • Confirm the host platform, port, electrical interface and firmware requirements.
  • Confirm availability, lead time, destination and applicable service terms before payment.
Description
MTDF-DST-A port caps supplied as a 32-unit pack. The connector-specific application is under review against differing manufacturer wording.

Product questions & answers

Can I select a replacement by appearance or wattage alone?

Use the manufacturer replacement-parts table for the complete switch model and order code. Matching dimensions, connector shape or PSU wattage alone does not establish compatibility.

Where should I check the replacement procedure?

Use the hardware manual for the exact chassis and component. Treat the replacement-parts list as ordering guidance; it does not replace the installation, airflow and safety instructions.

Does a public ordering or compatibility entry prove stock and delivery?

No. Record the manufacturer’s published lifecycle wording separately from commercial availability. Stock, lead time, software entitlement, support and warranty require a current supplier quote.

What is the specified configuration of MTDF-DST-A?

Port caps, 32 units; connector-specific application under review..

Describe what you need. You can start without a confirmed quantity or host model.

Channel and project resources

Move your next customer decision forward

Start with your current portfolio, a product family or an incomplete project list. Choose the material that fits your responsibility.

OA03 · NVIDIA

AI Ethernet, adapters and optical or cable interconnects.

930-9BBLK-00HW-000

BOM and open-items review

Keep the original part numbers and quantities together with the questions that affect a project decision.

Start with
Your existing list, uploaded BOM or a short description of the requirement. Incomplete lists are welcome.
Use this to prepare
An open-items table with original line references, missing inputs, responsible people and next actions.