NETWORK SWITCH
MTEF-FANF-K
NVIDIA MTEF-FANF-K fan module
| imageNote | Manufacturer technical illustration. |
|---|---|
| Airflow | P2C |
| Part Number | MTEF-FANF-K |
| Owner-listed systems | SN2201 |
| Owner-confirmed airflow | P2C |
| Publicly listed systems | SN2201 |
| Owner-confirmed technical configuration | NVIDIA Fan module, P2C Airflow, For SN2201 switch |
Before you order
- Confirm the exact SKU, part number, specification option and quantity.
- Confirm the host platform, port, electrical interface and firmware requirements.
- Confirm availability, lead time, destination and applicable service terms before payment.
Product questions & answers
What do P2C and C2P mean?
P2C moves air from the power side toward the connectors. C2P moves air from the connectors toward the power side. Select the direction specified for the exact switch configuration.
Can I select a replacement by appearance or wattage alone?
Use the manufacturer replacement-parts table for the complete switch model and order code. Matching dimensions, connector shape or PSU wattage alone does not establish compatibility.
Are parts shared across every switch in the same series?
No blanket compatibility is documented. For example, the SN5000 table lists separate fans and rails for SN5610, while several SN5400/SN5600 parts share one row. Follow each row’s supported-systems scope.
Where should I check the replacement procedure?
Use the hardware manual for the exact chassis and component. Treat the replacement-parts list as ordering guidance; it does not replace the installation, airflow and safety instructions.
Channel and project resources
Move your next customer decision forward
Start with your current portfolio, a product family or an incomplete project list. Choose the material that fits your responsibility.
OA03 · NVIDIA
AI Ethernet, adapters and optical or cable interconnects.
930-9NFAN-00IV-000
BOM and open-items review
Keep the original part numbers and quantities together with the questions that affect a project decision.
- Start with
- Your existing list, uploaded BOM or a short description of the requirement. Incomplete lists are welcome.
- Use this to prepare
- An open-items table with original line references, missing inputs, responsible people and next actions.