Manufacturer technical illustration.
NETWORK SWITCH
MTEF-PSF-AC-M
NVIDIA MTEF-PSF-AC-M power supply
| imageNote | Manufacturer technical illustration. |
|---|---|
| Part Number | MTEF-PSF-AC-M |
| Owner-listed systems | SN2201 |
| Owner-confirmed airflow | P2C |
| Owner-confirmed PSU rating | 250W AC |
| Owner-confirmed technical configuration | NVIDIA Power-Supply Unit, 250W AC, P2C Airflow, For SN2201 switch, Power cord included |
Before you order
- Confirm the exact SKU, part number, specification option and quantity.
- Confirm the host platform, port, electrical interface and firmware requirements.
- Confirm availability, lead time, destination and applicable service terms before payment.
Product questions & answers
Can I select a replacement by appearance or wattage alone?
Use the manufacturer replacement-parts table for the complete switch model and order code. Matching dimensions, connector shape or PSU wattage alone does not establish compatibility.
Where should I check the replacement procedure?
Use the hardware manual for the exact chassis and component. Treat the replacement-parts list as ordering guidance; it does not replace the installation, airflow and safety instructions.
Does a public ordering or compatibility entry prove stock and delivery?
No. Record the manufacturer’s published lifecycle wording separately from commercial availability. Stock, lead time, software entitlement, support and warranty require a current supplier quote.
What is the specified configuration of MTEF-PSF-AC-M?
NVIDIA Power-Supply Unit, 250W AC, P2C Airflow, For SN2201 switch, Power cord included.
Channel and project resources
Move your next customer decision forward
Start with your current portfolio, a product family or an incomplete project list. Choose the material that fits your responsibility.
OA03 · NVIDIA
AI Ethernet, adapters and optical or cable interconnects.
930-9NPSU-00J9-000
BOM and open-items review
Keep the original part numbers and quantities together with the questions that affect a project decision.
- Start with
- Your existing list, uploaded BOM or a short description of the requirement. Incomplete lists are welcome.
- Use this to prepare
- An open-items table with original line references, missing inputs, responsible people and next actions.



