Manufacturer technical illustration.
NETWORK SWITCH
930-9SECK-00MX-00A
NVIDIA ELS cleaning kit 930-9SECK-00MX-00A
| imageNote | Manufacturer technical illustration. |
|---|---|
| Part Number | 930-9SECK-00MX-00A |
| Documented procedure | Q3450-LD ELS inspection, cleaning and replacement |
| Owner-listed systems | Q3450 |
| Owner-confirmed technical configuration | External Laser Source Cleaning Kit for Q3450 |
Before you order
- Confirm the exact SKU, part number, specification option and quantity.
- Confirm the host platform, port, electrical interface and firmware requirements.
- Confirm availability, lead time, destination and applicable service terms before payment.
Product questions & answers
Can I select a replacement by appearance or wattage alone?
Use the manufacturer replacement-parts table for the complete switch model and order code. Matching dimensions, connector shape or PSU wattage alone does not establish compatibility.
Is an external laser source a conventional pluggable transceiver?
NVIDIA documents ELS components separately for its photonics switch systems. Use the switch-specific ELS order code and service procedure; a conventional OSFP transceiver is not established as a substitute.
What is the Q3450-LD ELS maintenance sequence?
NVIDIA’s procedure calls for inspection, cleaning when needed, and repeat inspection. Use the listed cleaning and inspection equipment and the complete service procedure, including its time and handling limits.
What does 930-9SECK-00MX-00A support in public documentation?
It is the cleaning kit listed in the Q3450-LD ELS replacement procedure. That listing does not establish compatibility with Spectrum photonics cleaning kits or with an unverified Quantum variant.
Channel and project resources
Move your next customer decision forward
Start with your current portfolio, a product family or an incomplete project list. Choose the material that fits your responsibility.
OA03 · NVIDIA
AI Ethernet, adapters and optical or cable interconnects.
930-9SECK-00MX-00A
BOM and open-items review
Keep the original part numbers and quantities together with the questions that affect a project decision.
- Start with
- Your existing list, uploaded BOM or a short description of the requirement. Incomplete lists are welcome.
- Use this to prepare
- An open-items table with original line references, missing inputs, responsible people and next actions.


