Series reference photo. Use the selected configuration's specifications and ordering code.
OPTICAL TRANSCEIVER
Arista Compatible 400 Gb/s OSFP SR4 100 m for Immersion Cooling Transceiver Module
Request a quote
Tell us what you need. We confirm the available option and terms in writing.
Your preference; availability is confirmed in the quote.
- Delivery is confirmed with your order or quotation.
- Confirm seller warranty terms before ordering.
- Confirm return terms before ordering.
Specifications
| Target equipment brand | Arista |
|---|---|
| Form Factor | OSFP |
| Wavelength | 850 nm |
| Connector | MPO-12/APC |
| Cooling | Immersion-cooled pigtail configuration |
| Protocol | Ethernet / InfiniBand |
| Data Rate | 400 Gb/s |
| Part Number | 400G100M-SR4-OSFP-C02 |
| Manufacturer | SwitchInfra |
| Maximum Power | ≤9 W |
| Optical Engine | VCSEL + PIN |
| Supply Voltage | 3.3 V |
| Case Temperature | 0 to 60 °C case |
| Catalog Order Code | 400G100M-SR4-OSFP-C02 |
| Fiber / Cable Type | Multimode fiber |
| Optical / Electrical Type | SR4 |
| Max. Transmission Distance | 60 m on OM3 / 100 m on OM4 |
Immersion-cooled pigtail confirmation before quoting
| Field | Status | What to verify |
|---|---|---|
| Host compatibility | Pending verification | Confirm the exact ConnectX-7 or other adapter order code for C02, its 400G OSFP mode, firmware, FEC and immersion enclosure. Request an NDR test if that mode is required. |
| Ordering configuration | Pending verification | Confirm the C02 order code for 100 m OM4, the 0–60 °C rating and the MPO-12/APC pigtail length and pinning. Confirm approved coolant and NDR support when required. Reconcile the reach with the selected supplier data sheet. |
Example BOM • Immersion-cooled pigtail
Immersion design example
| Role | Part number or selection | Example quantity | Selection notes |
|---|---|---|---|
| Optics at both ends | 400G100M-SR4-OSFP-C02 | 2 modules | Specify the immersion order variant and verify pigtail, fiber and coolant. Optics and splices depend on the host-side assembly. |
| Pigtail / trunk interface | Mating route after pigtail is confirmed | As specified | Confirm the pigtail outlet and connector at each end. Select the mating assembly and quote length. |
Before you order
- Confirm the exact SKU, part number, specification option and quantity.
- Confirm the host platform, port, electrical interface and firmware requirements.
- Confirm availability, lead time, destination and applicable service terms before payment.
Description
400 Gb/s OSFP SR4 optic for 60 m on OM3 / 100 m on OM4 links over multimode fiber. The catalog specifies MPO-12/APC. Configuration uses Immersion-cooled pigtail configuration.
Published ConnectX-7 testing covers a conventional OSFP SR4 sample. NADDOD #102336 and FiberMall #462123 provide immersion variant references with separate reach and environmental limits.
Use an immersion-qualified OSFP port at the stated rate. Confirm pigtail termination, coolant suitability, cable routing and host coding for the ordered configuration.
- Host compatibility · Pending verification. Confirm the exact ConnectX-7 or other adapter order code for C02, its 400G OSFP mode, firmware, FEC and immersion enclosure. Request an NDR test if that mode is required.
- Ordering configuration · Pending verification. Confirm the C02 order code for 100 m OM4, the 0–60 °C rating and the MPO-12/APC pigtail length and pinning. Confirm approved coolant and NDR support when required. Reconcile the reach with the selected supplier data sheet.
Request a quote for the selected build. The written quotation confirms order code, availability, lead time, price and applicable terms.
Product questions & answers
What must be confirmed before installation?
Confirm the exact immersion variant, coolant, cable jacket, sealing and pigtail termination with the supply configuration.
How is the reach specified?
The catalog lists 60 m on OM3 / 100 m on OM4. Check the loss of the installed path including the pigtail and all transitions.
Channel and project resources
Move your next customer decision forward
Start with your current portfolio, a product family or an incomplete project list. Choose the material that fits your responsibility.
OA03 · SwitchInfra
400G100M-SR4-OSFP-C02
BOM and open-items review
Keep the original part numbers and quantities together with the questions that affect a project decision.
- Start with
- Your existing list, uploaded BOM or a short description of the requirement. Incomplete lists are welcome.
- Use this to prepare
- An open-items table with original line references, missing inputs, responsible people and next actions.



