Technical Documentation

Comprehensive guides, configuration manuals, and technical resources for SwitchInfra network equipment

107 guides

Difficulty:
Cisco · Campus maintenance

Legacy Catalyst Replacement Checklist: Match Components and Preserve Services

Qualify replacement parts for Catalyst 3750-X, 6500 and 6800 environments through exact identity, dependencies, lifecycle and restoration tests.

Updated Sep 17, 2026
Cisco · Multigigabit access

C9300X Multigigabit Selection: Verify the Port Mix and PoE Budget

Select a C9300X configuration by exact port-speed distribution, endpoint power modes, uplink module and degraded-state requirements.

Updated Sep 17, 2026
Cisco · Campus fiber

Catalyst 9300 Uplink Module Checklist: Host Support Before Transceiver Choice

Select C9300 and C9300X network modules by exact host support, required interfaces, software conditions and complete optical links.

Updated Sep 17, 2026
Cisco · WAN routing

ASR and ISR Selection Checklist: Chassis, Modules, Services and Entitlements

Qualify a WAN router configuration by carrier handoff, hardware dependencies, service features, software rights and test conditions.

Updated Sep 17, 2026
Switch selection · Port planning

NVIDIA Switch Selection Worksheet: Logical Ports, Cages and Rack Requirements

Select a NVIDIA network switch by fabric role, logical-port budget, supported modes, installation constraints and operational baseline.

Updated Sep 17, 2026
ConnectX · BlueField

ConnectX and BlueField Selection: Host Fit, Protocol and Offload Requirements

Select ConnectX adapters or BlueField DPUs by exact variant, host integration, protocol support, software stack and operational ownership.

Updated Sep 17, 2026
Optics · DAC

Optics and Cable Selection Checklist: Qualify Both Endpoints and the Channel

Select optical modules, DACs, AOCs and breakout assemblies using a complete endpoint, operating-mode and physical-channel record.

Updated Sep 17, 2026
FRU · Power

NVIDIA FRU Selection: Identify the Installed Variant Before Ordering

Select replacement power supplies, fans, rails and accessories with a traceable equipment-to-part record and a verified replacement procedure.

Updated Sep 17, 2026