NETWORK CABLE

200G to 2 × 100G AOC Cable, QSFP56 to 2 × QSFP56; 100G per child, 10 m (CABLE-NC17)

P/N:CABLE-NC17SKU: CABLE-NC17SwitchInfra item:7710Compatible With: NVIDIA

Request a quote

Tell us what you need. We confirm the available option and terms in writing.

Ask for price
Supplier-reported availability

Your preference; availability is confirmed in the quote.

  • Delivery is confirmed with your order or quotation.
  • Confirm seller warranty terms before ordering.
  • Confirm return terms before ordering.

Specifications

Cable selection and application

For a 10 m cabling requirement with a QSFP56 parent and two 100G QSFP56 endpoints. Verify each child-side lane mode, then specify the split location and complete order configuration.
Form FactorQSFP56
MediaOptical fiber
Cable Length10 m
Minimum Bend Radius30 mm; the document does not distinguish static and dynamic limits
Data Rate200 Gb/s
Operating TemperatureCase temperature: 0–70 °C
ModelCABLE-NC17
ConditionNew
Cable TypeAOC
Wavelength850 nm
Power Supply3.14–3.47 V; typical3.3 V
Product TypeActive optical cable (AOC)
Cable Diameter3±0.2 mm
End ConnectorsQSFP56 → 2×QSFP56 (100G per end)
Storage Temperature−5–75 °C

Before you order

  • Confirm the exact SKU, part number, specification option and quantity.
  • Confirm the host platform, port, electrical interface and firmware requirements.
  • Confirm availability, lead time, destination and applicable service terms before payment.

Description

200 Gb/s; QSFP56 → 2×QSFP56 (100G per end); 10 m. For a 10 m cabling requirement with a QSFP56 parent and two 100G QSFP56 endpoints.

Product questions & answers

Describe what you need. You can start without a confirmed quantity or host model.

Channel and project resources

Move your next customer decision forward

Start with your current portfolio, a product family or an incomplete project list. Choose the material that fits your responsibility.

OA03 · Multi-brand

CABLE-NC17

BOM and open-items review

Keep the original part numbers and quantities together with the questions that affect a project decision.

Start with
Your existing list, uploaded BOM or a short description of the requirement. Incomplete lists are welcome.
Use this to prepare
An open-items table with original line references, missing inputs, responsible people and next actions.