Product reference photograph. Cable length is defined by this listing; bends and routing in the photograph do not indicate length.
1 / 3
NETWORK CABLE
200G to 2 × 100G AOC Cable, QSFP56 to 2 × QSFP56; 100G per child, 10 m (CABLE-NC17)
Request a quote
Tell us what you need. We confirm the available option and terms in writing.
Ask for price
Supplier-reported availability
Your preference; availability is confirmed in the quote.
- Delivery is confirmed with your order or quotation.
- Confirm seller warranty terms before ordering.
- Confirm return terms before ordering.
Specifications
Cable selection and application
For a 10 m cabling requirement with a QSFP56 parent and two 100G QSFP56 endpoints. Verify each child-side lane mode, then specify the split location and complete order configuration.
| Form Factor | QSFP56 |
|---|---|
| Media | Optical fiber |
| Cable Length | 10 m |
| Minimum Bend Radius | 30 mm; the document does not distinguish static and dynamic limits |
| Data Rate | 200 Gb/s |
| Operating Temperature | Case temperature: 0–70 °C |
| Model | CABLE-NC17 |
| Condition | New |
| Cable Type | AOC |
| Wavelength | 850 nm |
| Power Supply | 3.14–3.47 V; typical3.3 V |
| Product Type | Active optical cable (AOC) |
| Cable Diameter | 3±0.2 mm |
| End Connectors | QSFP56 → 2×QSFP56 (100G per end) |
| Storage Temperature | −5–75 °C |
Before you order
- Confirm the exact SKU, part number, specification option and quantity.
- Confirm the host platform, port, electrical interface and firmware requirements.
- Confirm availability, lead time, destination and applicable service terms before payment.
Description
200 Gb/s; QSFP56 → 2×QSFP56 (100G per end); 10 m. For a 10 m cabling requirement with a QSFP56 parent and two 100G QSFP56 endpoints.
Product questions & answers
Channel and project resources
Move your next customer decision forward
Start with your current portfolio, a product family or an incomplete project list. Choose the material that fits your responsibility.
OA03 · Multi-brand
CABLE-NC17
BOM and open-items review
Keep the original part numbers and quantities together with the questions that affect a project decision.
- Start with
- Your existing list, uploaded BOM or a short description of the requirement. Incomplete lists are welcome.
- Use this to prepare
- An open-items table with original line references, missing inputs, responsible people and next actions.



