Product reference photograph. Cable length is defined by this listing; bends and routing in the photograph do not indicate length.
1 / 3
NETWORK CABLE
200G AOC Cable, QSFP56 to QSFP56, 15 m (CABLE-NC18)
Request a quote
Tell us what you need. We confirm the available option and terms in writing.
Ask for price
Supplier-reported availability
Your preference; availability is confirmed in the quote.
- Delivery is confirmed with your order or quotation.
- Confirm seller warranty terms before ordering.
- Confirm return terms before ordering.
Specifications
Cable selection and application
For an integrated 200G optical link between QSFP56 interfaces. Keep the labelled 15 m sample length distinct from the family specification and the final 15 m order code.
| Form Factor | QSFP56 |
|---|---|
| Media | Optical fiber |
| Cable Length | 15 m |
| Data Rate | 200 Gb/s |
| Operating Temperature | Case temperature: 0–70 °C |
| Model | CABLE-NC18 |
| Condition | New |
| Cable Type | AOC |
| Modulation | PAM4; 26.5625 GBd per lane |
| Wavelength | 850 nm typical; 840–860 nm range |
| Power Supply | 3.14–3.46 V; typical3.3 V |
| Product Type | Active optical cable (AOC) |
| End Connectors | QSFP56 → QSFP56 |
| Operating Humidity | 10–90% |
| Storage Temperature | −40–85 °C |
| Electrical Interface | 4×53.125 Gb/s (200GAUI-4) |
Before you order
- Confirm the exact SKU, part number, specification option and quantity.
- Confirm the host platform, port, electrical interface and firmware requirements.
- Confirm availability, lead time, destination and applicable service terms before payment.
Description
200 Gb/s; QSFP56 → QSFP56; 15 m. For an integrated 200G optical link between QSFP56 interfaces.
Product questions & answers
Channel and project resources
Move your next customer decision forward
Start with your current portfolio, a product family or an incomplete project list. Choose the material that fits your responsibility.
OA03 · Multi-brand
CABLE-NC18
BOM and open-items review
Keep the original part numbers and quantities together with the questions that affect a project decision.
- Start with
- Your existing list, uploaded BOM or a short description of the requirement. Incomplete lists are welcome.
- Use this to prepare
- An open-items table with original line references, missing inputs, responsible people and next actions.



