NETWORK SWITCH

NVIDIA QM9790 NDR InfiniBand switch (MQM9790-NS2R)

P/N:MQM9790-NS2RSKU: 920-9B210-00RN-0D0SwitchInfra item:7718Brand:NVIDIA

Request a quote

Tell us what you need. We confirm the available option and terms in writing.

$27,961.20VAT excl.

Reference price. Confirm the exact variant, quantity, availability and final price in your quote.

Supplier-reported availability

Your preference; availability is confirmed in the quote.

  • Delivery is confirmed with your order or quotation.
  • Confirm seller warranty terms before ordering.
  • Confirm return terms before ordering.

Specifications

Form factor1U
AirflowC2P
AC input200–240 VAC, 10 A, 50/60 Hz
ProtocolInfiniBand
Data cages32 × OSFP
Data ports64 × NDR 400 Gb/s
Part NumberMQM9790-NS2R
Weight with two PSUs14.8 kg
Operating temperature0–40°C (reverse C2P)
Manufacturer lifecycleMass Production
Owner-confirmed airflowC2P
Maximum power with active cables1,610 W
Typical power with passive cables (ATIS)640 W
Management
  • Externally managed (ordering table: unmanaged)

Before you order

  • Confirm the exact SKU, part number, specification option and quantity.
  • Confirm the host platform, port, electrical interface and firmware requirements.
  • Confirm availability, lead time, destination and applicable service terms before payment.

Description

64 NDR 400 Gb/s links across 32 OSFP cages in a 1U chassis. This externally managed configuration uses connector-to-power airflow.

Example BOM and related parts

QM9700 NDR 400G optical BOM for eight servers

Confirm the configuration and quantities before selecting this option.

RoleModel and order codeExample quantity or statusSelection notes
Externally managed switch optionMQM9790-NS2R This product920-9B210-00RN-0D0OptionConnector-to-power airflow. Plan external fabric management and a subnet manager.

Check rack airflow, subnet management, port mapping, firmware, and channel loss. Choose the fiber length for each measured route.

View the full BOM and options Request a BOM review

Product questions & answers

Do the two QM9790 airflow variants have the same temperature limit?

No. The hardware specifications list 0–35°C for forward airflow and 0–40°C for reverse airflow. NS2F is P2C/forward; NS2R is C2P/reverse. Use the range for the installed variant when reviewing cooling.

Can I select a replacement by appearance or wattage alone?

Use the manufacturer replacement-parts table for the complete switch model and order code. Matching dimensions, connector shape or PSU wattage alone does not establish compatibility.

How do MQM9790-NS2F and MQM9790-NS2R differ?

The public ordering table assigns power-to-connector airflow to NS2F and connector-to-power airflow to NS2R. Match the rack cooling plan and replacement FRUs to that choice.

What does unmanaged mean for QM9790?

QM9790 is the externally managed member of the family. NVIDIA distinguishes it from QM9700/QM9701 with onboard management and describes using UFM for fabric operations. Plan the external fabric-management system explicitly.

How many network ports does QM9790 provide?

The QM97XX ordering table lists 64 NDR ports using 32 OSFP cages. Count logical links separately from physical cages when planning the fabric.

How can an operator check the uptime of an unmanaged QM9790?

An NVIDIA Developer Forums reply suggests the mlxuptime utility against the switch LID and using OpenSM logs to inspect removal or discovery events. Validate commands and permissions against your software environment.

Describe what you need. You can start without a confirmed quantity or host model.

Channel and project resources

Move your next customer decision forward

Start with your current portfolio, a product family or an incomplete project list. Choose the material that fits your responsibility.

OA03 · NVIDIA

AI Ethernet, adapters and optical or cable interconnects.

920-9B210-00RN-0D0

BOM and open-items review

Keep the original part numbers and quantities together with the questions that affect a project decision.

Start with
Your existing list, uploaded BOM or a short description of the requirement. Incomplete lists are welcome.
Use this to prepare
An open-items table with original line references, missing inputs, responsible people and next actions.